Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

The MARM awarded the contract management practices and environmental restoration of the stretch of coast between the grandchildren and smaller islands in Cartagena (23/10/2009)

The Government delegate, Rafael González Tovar, has announced that the Department of Sustainability of the Coast and the Sea (Ministry of Environment and Rural and Marine), has awarded the contract management practices and environmental restoration of the strip coast between the grandchildren and smaller islands in the area known as Cow Tongue, in Cartagena.

The works have been awarded to the company Construcciones SA Alpi 360,915.90 euros and have a lead time of five months.

This project, included in Plan E and which will create 10 jobs, is the recovery and environmental restoration of a unique scenic location that offers a privileged view of the Mar Menor.

This project covers a total area of 81,100 meters square.

In addition, to improve communication between Los Nietos and smaller islands, will be built to facilitate pedestrian traffic and includes a step on the boulevard of Carrasquilla.

The planned measures include the construction of a bike lane, a teaching area, a wooden walkway and a plaza, "creating spaces that combine environmental friendliness with the uses of leisure and rest of the population."

Restaurant area: It occupies the northern half from the esplanade to the town of Los Nietos and the southern half, took the entire band stretching from the sea to the teaching area.

In this space proceed to remove debris.

Elimination of exotic species.

Placement of vegetation next to the pumping station to mitigate its impact on the landscape.

Vials intended - All roads will have street furniture and litter bins, planters, guardrails, benches, etc.

A bike lane, that will leave one of the central streets of Los Nietos and connect with the tour of smaller islands and a pedestrian path, which depart from the promenade of Los Nietos and connect with the waterfront of the smaller islands.

Both will have a lighting system to facilitate evening stroll.

You can build two entrances to the sea.

Teaching Area - This is an educational and interesting, which generate a place where animal species will be planted to adapt to the salinity of the area and are resistant to drought.

Also, the teaching area will one side the bicycle lane on the other the promenade and may be crossed by a footbridge that crosses this space.

Boardwalk - This will be the infrastructure backbone for the area as well as facilitate the transition along the promenade will be a point where three roads converge: the teaching, the pedestrian and bike path shape as central to this entire environment.

The gateway will travel throughout the area teaching and ends with a place to house banks, interpretive panels Cow Tongue.

Its approximate length is just over 366 meters.

At the southern end of the bridge houses a square room is an area which provide an interpretive panel space, benches, another garden with a sample of the vegetation of the area.

In this space, it'll basic furniture such as bins, benches, containers, informative posters, and educational guidance.

These actions are part of the investments of the Plan E (Spanish for the Stimulus Plan for Economy and Employment) of the Government, working with the regions and municipalities in the affected areas and making the necessary interventions to improve the range coast, while respecting the environmental and landscape characteristics of each area and facilitate the use and enjoyment of the coast to all citizens.

Source: Delegación del Gobierno en Murcia

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información