Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

Full Partial Plan approved in the new extension Hondón (23/07/2008)

The Plenary of the Municipal Corporation of Cartagena meeting this morning, chaired by the Mayor, Pilar Barreiro, has approved the New Plan Partial Widening the area of El Hondon, with the favorable votes of the Popular Party, the abstention of the PSOE and vote against Citizens Movement.

The record that during public exhibition period has not recorded claims, contemplates an urban development area of 975,000 square meters, of which 64,000 will be allocated to green areas, 160,000 of equipment, roads and 220,000 to 600,000 square meters of buildings.

The aim is to create a transparent area, which was built some 5,400 homes, 540 are expected to be officially protected, with plenty of greenery and equipment and bike path connections.

In terms of buildable parcels, is expected in the lower part of Paseo Alfonso XIII is a ground floor and six floors and in the upper, ground floor and twelve floors.

Within this plan includes the undergrounding of the railway line, action will be followed by the disappearance of the corridor that exists today with the extension of Cartagena by the continuation of the Paseo Alfonso XIII.

It is also in motion the process of decontamination of soil that were located in the former premises of the company Potasas y Derivados, action that will perform Ercros and Landscape companies, owners at the time of more than 50% of the land .

Among other issues on the agenda, the plenum also approved the study in detail the plot P-1 action unit number 4 of The Hondón.

This is the land where the company was located Refrigerators Balsalobre, in Torreciega, with an area of 45,500 square meters where about 480 homes will be built with a type of ground floor plus six floors.

For this performance, the City will receive a plot of about 2,000 square meters with a building area of 4,800 square meters for the construction of some 50 homes or so.

It has also been given the green light to the provisional approval of the amendment of the Special Plan Management and Protection of the Historic Cartagena (PEOP) on the draft recovery from the ruins of the Roman amphitheater.

As you will recall the most important point of this change, with the abstention of the Socialist group, is related to the change of use of the plot next to the bullring.

Currently this parcel is green, becoming equipment due to the project of the Museum of Contemporary Art (MAID), while plots that were as equipment, behind the Graduate School, will become green.

This proposal also received allegations during his period of public exposure.

Source: Ayuntamiento de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información