Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

In councils, and the city (05/02/2010)

The mayor of Cartagena, Pilar Barreiro, continued Friday with his round of visits to districts and county to know personally the progress of project work that will make a marked improvement in the quality of life and services of the residents of peripheral areas of township.

Specifically, the mayor has been in Pozo Estrecho, where progress in the completion of the Musical Cultural Center, with 16 classrooms for music, and has completed one of four swimming pools covered in the short term work in Cartagena.

In La Puebla and La Aparecida, the mayor has visited the points of childcare (PAIS), also completed, and renovations of local social and sports courts construction.

MUSIC CENTER FOR SANTA CECILIA

Musical Cultural Centre Pozo Estrecho has a budget of 800,000 euros, of which 450,000 have been contributed by the Autonomous Community.

Its construction is being done in phases, being in the termination, with the inner workings of plastering, carpentry, electrical and plumbing.

The building will have a large rehearsal room and 16 classrooms of music.

Function as a conservatory and will be headquartered in the Santa Cecilia Musical Art Society, one of the bands and more roots of the Campo de Cartagena.

Heated Indoor Pool

Contained within the draft Plan E, the municipal swimming pool cover Pozo Estrecho is already completed, pending the test run.

Commissioning depends on the installation of the new power line in the recruitment process.

The budget for this work was around 1.4 million euros and consisted of a tent covering with detachable fabric 37 by 31 feet, with plywood plywood, and the improvement of their costumes and facilities in general and conditioning and lighting environment.

Has also been made to the cooling water so the pool basin and environmental.

COUNTRY SPORTS AND LOCAL SOCIAL AND APARECIDA LA PUEBLA

In La Puebla and La Aparecida the mayor has visited points childcare (PAI) that have been built in both locations, with capacities ranging between 41 and 60 children.

The centers are already completed and in operation since this year.

She has also met the progress of the remodeling of local social, with a budget, each of 90,000 euros.

In the case of La Puebla, the redevelopment includes the construction of a stage.

Finally, Pilar Barreiro has washed up in the sports centers in these two populations, whose works have been completed and have had a budget of 37,000 euros, in the case of La Aparecida, and of 161,000 in the La Puebla, which consisted in the placement of sports flooring and lighting to the health center annex.

Source: Ayuntamiento de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información