Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

Green light rehabilitation Llagostera House on Main Street (12/05/2009)

The Information Commission of Urban Planning and Infrastructure, has ruled favorably on the votes of the Popular Party and the abstention of PSOE and Citizen Movement, final approval of the Special Plan for the rehabilitation of the House and other adjacent Llagostera, located at numbers 21 and 23 of Main Street and 16 King Square.

The Special Plan sets out the directions of the Directorate General of Fine Arts and Cultural Assets, in the sense of retaining complete the facade of the Casa Llagostera and rebuild after demolition other items of interest as the hall, stairs and patios interiors.

Llagostera The house, designed by architect Victor Beltrí, dates from 1916 and its facade is a leading exponent of modernism in Cartagena based central balconies and gazebos sides and highlighting the Polo Gaspar ceramic decoration, with allegorical figures of Minerva and Mercury and the shields of Barcelona, Cartagena and Manlleu.

Inside it has proposed the construction of various houses and apartments, which provide parking in the basement, through a direct access to the rear of the Plaza del Rey.

The resulting building will have one floor of the four current (low plus three floors), it will be a recessed attic.

LAST INCREASE HEAD BEAZ

The Information Commission also ruled favorably, with the abstentions of the PSOE and the Citizens' Movement, the Plan that develops the fourth and final phase of expansion of the Industrial Cabezo Beaza, thus closing the perimeter of the industrial area around the mound that characteristic given name.

This extension covers an area of about 587,000 meters squared, of which 247,000 will be occupied by plots and industrial buildings north of the Mediterranean Area.

The plan is promoted by the current owners of the land, SL Prosser and Murcia Business Development and Management Services SL Consort

Thus, more than 20 years after the start of the first phase development of the test site at the edge of the road Torreciega La Aparecida, will culminate its urbanization process.

As you may recall he has had a place in the small and medium industries in the city.

His first two phases, in the mid 80's and early 90's, were promoted SEPES.

The third, which gave rise to the big commercial Mediterranean Park, was promoted in early 2000 by private initiative, as this fourth and final phase

The Information Commission of Urban Planning and Infrastructure will meet on Tuesday, May 12, under the chairmanship of the council of the area, Joaquín Segado.

The meeting, an ordinary, will be held after one o'clock in the Building of Urban Street Round of La Union.

Source: Ayuntamiento de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información