Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

SPCT proposes that El Cuco will become the health center of St. Anton-urbanization Mediterranean, New Cartagena, Fuente Cubas and Media Room (15/06/2013)

The Ministry of Education of the Autonomous Community has decided SPCT as reported infant school closing San Antonio Abad, best known as the Cuckoo Recoletos situated at the confluence of the neighborhoods of San Anton and Private Mediterranean.

From SPCT want to show once again our concern that the transfer of 100 children aged 3, 4 and 5 years at Colegio San Antonio Abad located in Amethyst is done to the detriment of the quality of education of all students at the school without meet the work promised by the Department and the City Council to adapt it to the rules that requires a child center, works today is not very clear to be made before the start of the new school.

In the same way SPCT requires the Autonomous Community that does not destroy more jobs and relocate not only the school students of CUCKOO dignified, but moved to the center of Amethyst Street, the concierge, the same number of teachers and cleaning staff.

As it appears that the decision is taken, from SPCT propose that to cover a historical demand of the area, and with the objective of using public spaces to install proceed with the remodeling that require school facilities, the new Health Center San Anton-Private Mediterranean-New Cartagena-Source Cubas and Media Room.

SPCT will immediately get in touch with FAVCAC "Fernando Garrido" to expose the idea, and makes it considers to be a consensus decision with neighbors and because this organization has fought for more than one decade, this infrastructure vital care for these populated neighborhoods of Cartagena.

Also indicate that this proposal has been moved to various groups in the area that have welcomed.

Finally aim, that our proposal seems reasonable from the economic point of view, because while management saves money, since the cost of remodeling could be considerably lower and faster than if you were to undertake a work completely, holding open a public place preventing closure occurs with a progressive deterioration of the facilities.

Remember to finish the PP has deceiving locals over 1 decade, with a promise that fails to materialize.

Source: Socialistas por Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información